Tuesday, August 25, 2009

Another day of progress

Today the septic system installation was completed and inspected. Also the insulation was installed along with the pex for the radiant slab in the basement.

The well driller should start tomorrow, they may have arrived after we left today.

The slab should be poured on Thursday.