The last 2 days have seen a lot of activity. A lot of the basement framing has been constructed. We have a well that is 350' deep and produces 40 gpm. We had watched the well driller most of yesterday only to have it "come in" about a half hour after we left.
Today they poured the garage floor and have enough of the basement studded that the floor joists can be installed on Monday. The septic drain field was "capped" with topsoil today and a lot of rough grading was done on the left side of the lot.
We were on our way home when we saw a red Austin Healy 3000 approaching. Knowing it was Wally we found a place to make a U turn and met them at the lot.
Click for today's pictures and here for yesterday's pictures.