Today we purchased our appliances and set the delivery date for 10/1. There were a number of rebates, not instant, that we qualify for and we will get that paperwork in as soon as t he appliances arrive. After lunch we visited the local propane supplier, Jack F. Corse, to set a date for the tank delivery and interior gas plumbing.
When we arrived at our house site we were greeted with a standing front wall. Also the cabinet maker, Charles Tinker, was there to review the plans and how it layout looked. Charles and Casey went over everything and made measurements on the floor and double checked dimensions.
We stayed around until a little after 3 PM while the back walls were being built. I helped carry stuff so Adam's could keep working. Suzette lent a hand pulling staples that held the wrap from the 2 by as well as move stuff.
On our way back to the camper we had a phone message that our construction loan had been approved and the closing would be as soon as possible, likely after we receive our commitment letter.
Today's pictures.