That's what keeps us busy.
Since Russell Supply is on our way, more or less, we stopped to pick up a couple boxes of Senco nails for our contractor, he paid. We can do gopher work so they can do the real work.
When we arrived at the site the electrician was there installing the meter and breaker boxes. While he was doing that Casey and crew were installing drip edge along the rear of the house. That done they were installing the ice and snow shield when the boom truck arrived with some more lumber and the shingles. Once the truck was unloaded and the shingle bundles were placed on the roof it was lunch time.
After lunch we met with the electrician and went through each room discussing switch, lighting, and outlet locations. That took longer that I thought it would but it was time well spent.
Pictures here.