Tuesday, September 15, 2009

Moving along

Today the plumber finished the drains and vents and was working on the water supply when we left. The power company arrived and installed the cable from the box to the house. Casey and team worked on the roof over the breakfast nook.

We didn't get there until late since we had some shopping to do. We looked at vanity mirrors, returned a utility sink to Home Dumpy and went to lowes and bought another one along with the faucet assembly. We get to return the faucet assembly since it is not the correct one for the sink.

We had a lot of discussion with the plumber, Casey and Terri on what we wanted for fixtures. Somewhere in the discussion the finish of the fixtures got lost. The plumber quoted chrome and we wanted a brushed finish. Since the tub/shower and shower are installed we will let them be chrome and the faucets will be a brushed finish. We will purchase the kitchen sink fixture because we couldn't find what we wanted in the catalog that was available.

Siding arrived today as well as some other materials.

Tomorrow the electrician arrives to do his thing. I'm sure there will be more discussion there.

Pictures here.

No comments: